mirror of
https://git.kernel.org/pub/scm/linux/kernel/git/stable/linux.git/
synced 2026-10-14 05:55:17 +00:00
drm/i915/gen9_lp: Increase DDI PHY0 power well enabling timeout
On GLK sporadic timeouts occur during PHY0 enabling. Based on logs it looks like they happen sometime after a system suspend/resume cycle, with the same power well enabling succeeding both before and after the failed one and no other problems observed. The current timeout in the code is not actually specified by BSpec, so let's try to increase that until a BSpec update. Bugzilla: https://bugs.freedesktop.org/show_bug.cgi?id=105771 Signed-off-by: Imre Deak <imre.deak@intel.com> Link: https://patchwork.freedesktop.org/patch/msgid/20180409122716.4055-1-imre.deak@intel.com Reviewed-by: Ville Syrjälä <ville.syrjala@linux.intel.com>
This commit is contained in:
parent
8b69449d26
commit
1b85147b4b
1 changed files with 6 additions and 5 deletions
Loading…
Add table
Add a link
Reference in a new issue