s390/dasd: fix unaccessible device after resume

If a channel path is cabled incorrectly and the device is suspended and
resumed the device may be inaccessible afterwards.
Make the path connection check not interrupt the resume callback there
could be other valid paths available.

Signed-off-by: Stefan Haberland <stefan.haberland@de.ibm.com>
Reference-ID: RQM 1262
Signed-off-by: Martin Schwidefsky <schwidefsky@de.ibm.com>
This commit is contained in:
Stefan Haberland 2012-11-27 17:04:14 +01:00 • committed by Martin Schwidefsky
commit 55d3a85cd2