drm/v3d: Serialize jobs across queues when a perfmon is attached

A non-global perfmon is meant to count events generated by a specific
submission, but the scheduler can run jobs from different queues
concurrently on the same V3D core. Without explicit serialization, an
unrelated job running in parallel with a perfmon-carrying job pollutes
the counters and generates unusable results.

To address such issue, we must enforce cross-queue serialization when we
detect a perfmon-carrying submission. It's possible to implement
serialization by enforcing two rules:

  1. A job that carries a non-global perfmon must wait for every job
    currently in-flight across all HW queues to finish.

  2. While a perfmon-carrying job is still in-flight, all subsequently
    submitted jobs must wait for it.

Note that serialization is not needed in the global perfmon case, as the
global perfmon tracks activity from all jobs, so concurrency is desirable.

Therefore, check if serialization is needed during job submission and if
so, attach fence dependences to enforce cross-queue serialization.

Reviewed-by: Iago Toral Quiroga <itoral@igalia.com>
Link: https://patch.msgid.link/20260706-v3d-perfmon-lifetime-v4-2-d7b312ff2c83@igalia.com
Signed-off-by: Maíra Canal <mcanal@igalia.com>
This commit is contained in:
Maíra Canal 2026-07-06 10:29:19 -03:00
commit 9cf5cbd864
No known key found for this signature in database
GPG key ID: 3FF30E8A7688FAAA
4 changed files with 110 additions and 6 deletions