sched/numa: Check all nodes when placing a pseudo-interleaved group

In pseudo-interleaved numa_groups, all tasks try to relocate to
the group's preferred_nid.  When a group is spread across multiple
NUMA nodes, this can lead to tasks swapping their location with
other tasks inside the same group, instead of swapping location with
tasks from other NUMA groups. This can keep NUMA groups from converging.

Examining all nodes, when dealing with a task in a pseudo-interleaved
NUMA group, avoids this problem. Note that only CPUs in nodes that
improve the task or group score are examined, so the loop isn't too
bad.

Tested-by: Vinod Chegu <chegu_vinod@hp.com>
Signed-off-by: Rik van Riel <riel@redhat.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: "Vinod Chegu" <chegu_vinod@hp.com>
Cc: mgorman@suse.de
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Link: http://lkml.kernel.org/r/20141009172747.0d97c38c@annuminas.surriel.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
This commit is contained in:
Rik van Riel 2014-10-09 17:27:47 -04:00 • committed by Ingo Molnar
commit 9de05d4871