TanStack Time — Roadmap

Goal: a comprehensive headless library for all calendar / scheduling / date-operations cases. Strategy: ship an alpha, then layer the rest across subsequent releases. North star for feature parity: Bryntum Scheduler Pro — headless (data only; consumers render geometry, editors, arrows, histograms).

The phase ordering is gated by two rules the team confirmed:

  1. Kernel first. No new features land on the CalendarCore monolith (3,872 lines when this was written, 2,755 once Phase 0 landed). The ADR 0001 decomposition happens before the alpha; alpha slips rather than shipping the god class (resolves the "alpha now vs freeze features" tension in favour of freeze).
  2. Breaking changes are fine pre-1.0. Calendar-hierarchy (ADR 0008) and solver-driven event-model additions (ADR 0007) land as breaking changes before/at the alpha so consumers migrate once.

Phase 0 — Foundation refactor (gates the alpha)

Prerequisite for everything. Nothing user-facing.

  • Decompose CalendarCore into one feature-agnostic kernel + modules as pipeline stages (ADR 0001). Kernel + {recurrence, availability, dependency, resize, undo, layout} modules; CalendarCore writes through the kernel and the kernel owns the events. What is left on the class is orchestration and read-side indexes, not rules — see docs/plans/phase-0-decomposition.md.
  • Extract pure, isomorphic validation core — no store/viewport/DOM (ADR 0004). The rules live in validation/{availability,dependency}, recurrence/, and projection/, called with plain serializable args; the kernel's veto stage is the validate(write, events, config) → conflicts entry point (availabilityModule). A test walks those directories and fails if any of them imports the store, the event client, the kernel or CalendarCore, or touches the DOM.
  • Migrate boundary types: currentPeriod / activeDate are ISO YYYY-MM-DD strings and Day.date is gone (Day.isoDate was already the documented field), so no Temporal value crosses the calendar boundary (ADR 0002). The { value, options, asZonedDateTime } shape the Date Primitives returned contradicted the same ADR; that was the Phase 1 audit below, and it has since landed.
  • Remove pixels from the core: containerHeight dropped from getUnavailableRanges (now startFraction/endFraction + %); logical layout (startFraction, endFraction, column, columnCount) lives in the layout projection stage with toLayoutStyle for % output. getEventProps / getTimelineLayout delegate to the pure cores (layoutDaySegments, layoutTimelineRange) and expose raw fractions (ADR 0003).
  • Undo/redo → command diffs, not full-event snapshots (memory). undoModule records one entry per committed kernel batch and replays it through history/undo / history/redo intents; CalendarCore journals its own mutations into the same {reason, ops} batches and replays them with invertWriteOps, so an entry costs the ops touched instead of a copy of every event.

Phase 1 — Alpha (Calendar product, React)

Ships once Phase 0 lands. Scope from ADR 0005 plus the pre-alpha breaking model changes.

  • Feature composition as the public API (ADR 0009) — features becomes a required option built by calendarFeatures({ ... }); modules contribute their own methods and the instance surface is what was composed. Lands first in this phase: the hierarchy and solver items below attach as features, so doing it after means writing them twice. Slice plan in docs/plans/phase-1-feature-composition.md; the kernel's Module.api seam landed.
  • Date Primitives (already present — audited for the ADR 0002 return-type contract). The twelve instant-bearing primitives returned the { value, options, asZonedDateTime } tuple the ADR rejects; they now return a native Date, which also makes them compose as DateInput. See docs/plans/phase-1-date-primitives-audit.md. DateInput still accepts Temporal values — an input-side question the audit deliberately left open.
  • Kernel: event collection + viewport + projection + plain CRUD + getRequiredRange / rollback.
  • Calendar product modules: recurrence (UI-builder subset), drag-resize, advisory availability.
  • Working-time calendar hierarchy (ADR 0008) — replaces flat Resource.availability. Breaking; lands here so alpha ships the target shape. Resources reference shared calendars by id, resolution is root-to-leaf painting with a global specificity sort, and workingTimeFeature exposes it — see docs/plans/phase-1-working-time-hierarchy.md.
  • Event-model additions for the solver (ADR 0007): dependency lag/lead, constraints, manuallyScheduled, effort/duration. Types only + honoured by validation; full solver is Phase 2. All four slices landed — see docs/plans/phase-1-solver-event-model.md. The write pipeline now vetoes through four validate stages (availability, constraint, duration, dependency).
  • Dependencies FS/SS/FF/SF (present) become a proper module — dependencyModule, landed in Phase 0.
  • Undo/redo (present) becomes a module — undoModule, landed in Phase 0.
  • Timeline/Gantt view (present) — ships as a view, not a separate product.
  • React adapter supported; Solid kept as framework-agnostic proof. Both are thin wrappers over composed construction (ADR 0009) — Solid is written against the split rather than porting the monolith.
  • Update README/package messaging: five-framework claim is aspirational, not alpha.

Phase 2 — Scheduling engine

The Bryntum moat. Requires Phase 0 purity + Phase 1 calendar hierarchy.

  • Solver (ADR 0007): fixpoint schedule stage, ASAP/ALAP, client-authoritative.
  • Scheduling constraints (SNET / MSO / FNLT / …) honoured by the solver.
  • Solver consumes effective working-time (ADR 0008) for date skew.
  • Conflict data + candidate fixes (headless; consumer renders resolution).
  • Server re-validation of the solved schedule via the shared pure core.

Phase 3 — Scale & server mode

  • Data Strategy client | server (ADR 0006): per-stage execution location.
  • Server package handlers per delegatable op: expandRange, getConflicts, generateSlots, validateWrite, plus solve re-validation.
  • Write-sync protocol (bidirectional; optimistic + server reconcile) beyond read-only fetchEvents.
  • Virtualization contract for large datasets (windowed projection; no px in core).
  • generateSlots — free/available-slot generation (booking / Calendly use case).

Phase 4 — Scheduler product & richer scheduling

  • Scheduler product as a preset over the kernel/modules (ADR 0001/0005).
  • Resource assignment as a first-class M:N entity (per-assignment units/effort).
  • Resource histogram / utilization data (bins; consumer renders).
  • Recurrence completeness: BYMONTHDAY / BYSETPOS / BYYEARDAY, "2nd Tuesday", multi-rule.
  • Recurring time ranges (highlighted zones).
  • Non-continuous time axis (skip nights/weekends) + zoom/time presets, derived from working-time intervals.
  • Event layering modes (pack / stack / mixed) beyond overlap-coloring.
  • Baselines, progress / percent-done, travel/setup time as first-class.

Phase 5 — Interop, more frameworks, polish

  • RRULE / .ics import-export (RFC 5545).
  • MS Project import.
  • Export data contracts for PDF/PNG/Excel/print (headless; consumer renders/serializes).
  • Vue / Svelte / Angular adapters.
  • RTL, deeper localization.
  • Non-Gregorian calendar QA (must keep working via Temporal throughout; supported here).
  • Cross-scheduler drag / partners (data contracts).

Deferred / explicitly out (revisit per phase)

  • Rendering: arrows, editors, dialogs, histogram bars — consumer's job (headless). Example: examples/react/timeline renders dependency arrows with @xyflow.
  • Concrete HTTP transport / routes — consumer owns transport (ADR 0004/0006).
  • Batteries-included backend (storage, DB adapters, transactions).

ADR index

ADR Decision
0001 One kernel; modules as pipeline stages
0002 Public return types: Date for instants, ISO strings for civil values
0003 Logical layout in core; % prop-getter for positioning
0004 Advisory client validation; authoritative server via shared pure core
0005 v1 scope: Calendar product, React-only, some deferred
0006 Client/server Data Strategy (computation push-down)
0007 Scheduling solver: fixpoint stage in write pipeline, client-authoritative
0008 Working-time calendars as id-referenced shared entities with resolution hierarchy