Three features decide whether an event may sit where it is: resourceAvailabilityFeature checks
working hours and capacity, schedulingConstraintFeature checks date constraints, and
eventDurationFeature checks declared duration and effort. Each one answers queries and also
vetoes writes. See
ADR 0004
for why client answers are only advisory.
Setup
import {
between,
calendarFeatures,
compileSchedule,
createCalendar,
eventDurationFeature,
merge,
resourceAvailabilityFeature,
schedulingConstraintFeature,
weekday,
workingTimeFeature,
} from '@tanstack/time'
const calendar = createCalendar({
features: calendarFeatures([
workingTimeFeature,
resourceAvailabilityFeature,
schedulingConstraintFeature,
eventDurationFeature,
]),
timeZone: 'Europe/Warsaw',
calendars: [
compileSchedule({
id: 'office',
timeZone: 'Europe/Warsaw',
on: [merge(weekday(1, 2, 3, 4, 5), between('09:00', '17:00'))],
}),
],
defaultCalendarId: 'office',
resources: [
{ id: 'ana', label: 'Ana' },
{ id: 'room-a', label: 'Room A', calendarId: 'office', capacity: [1] },
],
})
resourceAvailabilityFeature requires workingTimeFeature; composing it alone throws. Working
calendars, parentId inheritance and defaultCalendarId are covered in
Working time.
Resources and capacity
A Resource is { id, label, calendarId?, capacity? }. A resource's minutes come from its calendarId, falling back to defaultCalendarId. An event's own
calendarId is layered on top, so an after-hours calendar on the event can open time the resource
calendar keeps closed.
capacity and an event's consumption are both summed. capacity: [1, 2] is three units, and
consumption: [0, 1] uses one. Missing consumption counts as 1. Placement is blocked when the
overlapping usage plus the new event exceeds the sum; equal to capacity is allowed.
Pitfalls worth knowing:
- A resource with no
capacityis never capacity-checked. Two events can overlap on it freely. - A resource with no calendar and no
defaultCalendarIdis closed all day. Every placement on it fails with reasonno-calendar. - An event with no
resourcesis never availability-checked at all.
Multiple resources
multiResource on the calendar options decides how an event assigned to several resources is
judged:
'intersection'(default) blocks when any assigned resource is unavailable.'union'blocks only when every assigned resource is unavailable.
The shading queries below always merge working minutes across the selected resources, so a range is shaded only when all of them are off. Under the default policy validation can block time that is not shaded.
Shading unavailable time
const ranges = calendar.getUnavailableRanges('2026-10-05', { resourceIds: ['room-a'] })
const minutes = calendar.getUnavailableMinuteRanges('2026-10-05', { resourceIds: ['room-a'] })
getUnavailableRanges returns render-ready UnavailableRange objects: startFraction,
endFraction, percentage top and height, and startTime/endTime labels. It never emits
pixels. getUnavailableMinuteRanges returns plain { startMinutes, endMinutes } pairs.
Omit resourceIds to use every resource. Both return [] when the calendar has no resources.
Explaining why
const details = calendar.getUnavailabilityDetails('2026-10-05', 7 * 60, 10 * 60, {
resourceIds: ['room-a'],
})
Each UnavailabilityDetail carries resourceId, resourceLabel, a reason of 'outside-hours',
'capacity' or 'no-calendar', and a human-readable description. An empty array means the span
fits. This is a working-hours check only; it does not look at other events.
For a single day span that also counts other events, use getDaySpanConflicts:
const conflicts = calendar.getDaySpanConflicts({
date: '2026-10-05',
startMinutes: 9 * 60,
endMinutes: 10 * 60,
eventId: 'standup',
resourceIds: ['room-a'],
})
It returns every conflicting sub-range, one AvailabilityConflict per closed range plus one per
over-capacity resource. The event named by eventId is excluded from the count.
Checking a proposal
const event = calendar.getEvents()[0]!
const conflict = calendar.checkEventAvailability(
event,
'2026-10-05T16:00:00',
'2026-10-05T18:00:00',
)
const { blocked, message } = calendar.validateEventPlacement({
title: 'Review',
start: '2026-10-05T09:30:00',
end: '2026-10-05T10:30:00',
resources: ['room-a'],
consumption: [1],
})
checkEventAvailability(event, newStart, newEnd, newResources?, newConsumption?) returns the
first conflict or null. Multi-day spans are walked day by day and the walk stops at the first
failing day. validateEventPlacement is the same check for an event that does not exist yet,
reduced to { blocked, message? }.
Both accept resources as objects or ids. An id that matches no configured resource gets no calendar
of its own and falls back to defaultCalendarId.
The AvailabilityConflict shape
interface AvailabilityConflict {
date: string
conflictRange: { start: string; end: string }
resourceIds: Array<string>
resourceDetails: Array<UnavailabilityReason>
description: string
}
conflictRange is HH:mm on date. For capacity failures the matching UnavailabilityReason
also carries capacityInfo: { max, used, remaining }.
Constraints
An event's constraint pins its start or finish:
import type { Event } from '@tanstack/time'
const event: Event = {
id: 'launch',
title: 'Launch',
start: '2026-10-05T10:00:00',
end: '2026-10-05T11:00:00',
constraint: { type: 'finish-no-later-than', date: '2026-10-05T12:00:00' },
}
calendar.checkEventConstraint(event, '2026-10-05T12:00:00', '2026-10-05T13:00:00')
type is one of start-no-earlier-than, start-no-later-than, finish-no-earlier-than,
finish-no-later-than, must-start-on, must-finish-on. checkEventConstraint(event, newStart?, newEnd?, newConstraint?) returns a conflict with type, anchor, date and message, or null.
A date-only date compares calendar days: must-start-on: '2026-10-05' accepts any start on
that day. Add a time to compare to the minute. Constraints are checked, not solved; see
Scheduling.
Duration and effort
getWorkingDuration(event, newStart?, newEnd?) counts working minutes of the span for the event's resources, not wall
clock: 07:00–12:00 against a 08:00 opening is 240. With no calendar configured it falls
back to wall-clock minutes.
checkEventDuration(event, newStart?, newEnd?, newResources?) returns an array. An event declaring
duration gets duration-mismatch when the span's working minutes differ from it. An event
declaring effort gets effort-exceeds-duration when effort is larger than duration (or the
working span, if no duration). Events declaring neither are never checked.
How writes are vetoed
Each feature adds a validate stage to the write pipeline. Any conflict rejects the whole write, dependency cascades included, and nothing is applied: no partial state and no undo entry.
const result = await calendar.editEvent('launch', {
start: '2026-10-06T10:00:00',
end: '2026-10-06T11:00:00',
})
if (!result.success) console.log(result.error.message)
addEvent and editEvent return { success: false, error } whose message describes the first
conflict. validateMove answers the same question without writing. commitAdd and commitUpdate return
nothing: a vetoed write there is silently dropped. Use them only after validating.
Write-pipeline conflicts use a small common shape, code, message and eventIds, where code is
availability/<reason>, constraint/<type> or duration/<reason>. book() returns these
directly; see Booking.
Client answers are advisory
Every check above runs against the events the client has loaded. It cannot see unloaded ranges or other users' concurrent writes, so a passing check is instant feedback, not a guarantee.
Re-validate on the server inside the same transaction as the write, and back raw overlap with a
database constraint. @tanstack/time does not yet export a server-side validator for these rules;
generateSlots is the only pure core available today. See
ADR 0006
for the planned client and server modes.