eventDependencyFeature links events into a graph. When one event moves, the ones that depend on it move with it, and a move that cannot be carried through is rejected as a whole. See ADR 0007 for why the solver is a stage of the write pipeline from ADR 0001 and not a separate reactive engine.

Setup

import { calendarFeatures, createCalendar, eventDependencyFeature } from '@tanstack/time'
import type { Event } from '@tanstack/time'

const events: Array<Event> = [
  { id: 'design', title: 'Design', start: '2026-10-05T09:00:00', end: '2026-10-05T12:00:00' },
  {
    id: 'build',
    title: 'Build',
    start: '2026-10-05T13:00:00',
    end: '2026-10-05T17:00:00',
    dependsOn: [{ id: 'design', type: 'FS', lag: 60 }],
  },
]

const calendar = createCalendar({
  features: calendarFeatures([eventDependencyFeature]),
  timeZone: 'Europe/Warsaw',
  viewMode: { value: 1, unit: 'week' },
  events,
})

eventDependencyFeature is also part of stockFeatures.

A link lives on the successor. dependsOn[].id is the predecessor:

interface EventDependency {
  id: string
  type: DependencyType
  lag?: number
}
Type Rule
FS successor start ≥ predecessor end + lag
SS successor start ≥ predecessor start + lag
FF successor end ≥ predecessor end + lag
SF successor end ≥ predecessor start + lag

lag is in minutes and defaults to 0. A negative lag is a lead: { type: 'FS', lag: -30 } lets the successor start half an hour before the predecessor ends.

Every rule is a lower bound. Moving a predecessor earlier leaves its successors where they are. The solver closes gaps that break a rule. It never compacts slack.

Propagation on write

Every write that changes an event's start or end runs the schedule stage before validation:

  • The events you moved are fixed for this write. So is every event with manuallyScheduled: true.
  • A broken link with a free successor pushes the successor forward.
  • A broken link with a fixed successor pulls the predecessor backward.
  • Shifts keep each event's length and continue through the whole chain, to a fixed point.
calendar.commitUpdate('design', { end: '2026-10-05T14:00:00' })

calendar.getEvents().find((event) => event.id === 'build')?.start

build now starts at 15:00: design ends at 14:00, plus the 60-minute lag.

The shifted events join the same write batch. The availability, constraint and duration validate stages then check every event in the batch. If one cascaded event lands in unavailable time or breaks its constraint, the whole write is rejected, including the event you moved. With historyFeature, one undo reverts the whole cascade.

The calendar's schedule stage moves events by wall-clock time. It does not skew a pushed event across non-working time and it does not clamp to constraints. A cascade into a closed hour is rejected, not snapped to the next working minute.

Manually scheduled events

manuallyScheduled: true makes an event an anchor. Propagation never moves it:

const result = await calendar.editEvent('design', {
  start: '2026-10-05T12:00:00',
  end: '2026-10-05T15:00:00',
})

if (!result.success) {
  console.log(result.error.message)
}

If build is manually scheduled, this is rejected with "Build" cannot start before "Design" ends +60m (FS) — "Build" is manually scheduled. Nothing moves. A move that the anchor still has slack for is allowed.

You can still move an anchor directly. It pushes its free dependents like any other event.

Use editEvent, not commitUpdate

commitUpdate returns nothing. A vetoed write is dropped silently. editEvent returns a SaveEventResult and runs validateMove first, so the error tells you which event blocked the move and why:

  • a manually scheduled event would have to move,
  • the moved event breaks its own constraint or declared duration,
  • a pulled predecessor or pushed dependent would land in unavailable time, or break its constraint or duration.
const result = calendar.createDependency('design', 'build', 'SS', 30)

if (result.blocked) {
  console.log(result.error?.message)
}

createDependency(sourceId, targetId, type?, lag?) adds sourceId as a predecessor of targetId. type defaults to 'FS'. If the target breaks the new rule, it moves forward by the shortfall in the same write. The call returns { blocked: true, error } when:

  • sourceId === targetId, or the source already depends on the target, directly or indirectly,
  • the target is manually scheduled and would have to move,
  • the target's new position fails validateMove. The error.reason is 'unavailable-time'.

Adding a link that already exists with the same type and lag is a no-op. The same pair with a different type is a second link.

If either id is unknown, the call returns { blocked: false } and does nothing.

Cycles

createDependency refuses cycles. Links you load through events or write with commitUpdate are not checked. When the data already has a cycle, the solver skips the links inside the cycle and propagates the rest. You get no error. The solver has an iteration cap, so a cycle can not make a write hang.

Checking before you commit

All of these are read-only. newStart and newEnd are plain date-time strings in the calendar's timeZone.

calendar.validateEventDependencies(
  { title: 'Review', start: '2026-10-05T10:00:00', end: '2026-10-05T11:00:00' },
  [{ id: 'design', type: 'FS' }],
)

validateEventDependencies(event, dependsOn) returns { valid, error? } for the first broken link. It skips unknown predecessor ids and does not check for cycles. addEvent and editEvent call it when you pass options.dependsOn, but that option is only a check. The links are stored only when they are also in the event's own dependsOn.

findViolatedDependency(event, proposedStartMs, proposedEndMs) checks only the event's own links against a span in epoch milliseconds. It returns { dependency, predecessor } or null. The resize feature uses it.

getAnchorConflicts(eventId, newStart, newEnd) runs the same pull and push as a real move. It returns the links that touch a manually scheduled event and are still broken:

const [conflict] = calendar.getAnchorConflicts(
  'design',
  '2026-10-05T12:00:00',
  '2026-10-05T15:00:00',
)

conflict?.anchorId

Each entry has eventId, eventTitle, predecessorId, predecessorTitle, type, message, originalStart, originalEnd and anchorId. validateMove checks this first.

The preview methods return Array<DependencyShift<TEvent>>, where each item is { event, newStart, newEnd }:

Method Previews
getDependentShifts(eventId, newStart, newEnd) successors pushed forward by the new span
getPredecessorShifts(eventId, newStart, newEnd) predecessors pulled back by the new span
getAffectedByDelta(eventId, deltaMs) successors pushed when the event moves by deltaMs

Previews are geometry only. They skip manually scheduled events and do not check availability, constraints or duration. Use validateMove for the full answer.

Not covered

The pure solve core also supports ASAP/ALAP direction, working-time skew and constraint clamping (ADR 0007). It is not exported from @tanstack/time, and the calendar's schedule stage does not use those options yet. Solver conflicts are not returned to you. You only get the veto from the validate stages. See Working time and Features.